Bridge Repairs

Case Study Details
Project Highlight
Design included the installation of a monorail system

Benchmark was engaged in 2009 to design and install a suspended scaffolding system below the bridge for the Roadtek crew to complete routine maintenance over a 5 year period.

The design included the installation of a monorail system to either side of the bridge to allow a mobile gantry style scaffold to be moved backwards and forwards between spans eliminating the need for excess scaffold and weight applied to the bridge and reduced scaffold labour to move the modules.

Share this Case Study
Share on facebook
Share on twitter
Share on linkedin
Share on skype
Share on pinterest
Share on email
Subscribe
Did you enjoy this article? Subscribe for more!
Get A Quote
  • This field is for validation purposes and should be left unchanged.

Share This

Select your desired option below to share a direct link to this page

Share on facebook
Share on twitter
Share on linkedin
Share on skype
Share on pinterest
Share on email