![Image10](https://www.benchmarkscaffolding.com.au/wp-content/uploads/2021/07/image10-1060x560.jpg)
Project Overview
- This scaffold was constructed to allow the client to jack the bridge and replace the bridge bearings
- Scaffold was designed to allow the client to install their jacking frames without the interference of the scaffolding impeding their work.
- All scaffold was installed from a workboat.
Share this Case Study
![Unnamed (1)](https://www.benchmarkscaffolding.com.au/wp-content/uploads/2021/07/unnamed-1.jpg)